In 2021 we delivered a new project in the Middle East area, UAE, for one of the biggest players in the retail and food industry - the Abu Dhabi Co-Operative Society (ADCOOP). They were building a new distribution point, and we provided the complete automation solution for the refrigeration plant.

We delivered then a total of 22 meters in length of electrical panels. For this project, we used more than 10 kilometers of internal wiring, 2500 pcs of terminals, 10 000 terminal pins, and around 180 cable lugs. The system automation design by our team included local control panels for compressors, ammonia leakage control panels, utility control panels, and SCADA applications.

In 2023, following the delivery of the electrical panels and the expeditious completion of the civil works, the commissioning stage was successfully concluded. Significantly tall and standing at an impressive height of 27 m, the warehouse has a considerable capacity of accommodating approximately 35,000 palettes. This warehouse has six main chiller and freezer areas for housing products with an immense volume of 75,000cbm.

Our diligent commissioning team, in collaboration with specialists from various fields, worked together to start the refrigeration system.

During this stage, electrical testing, equipment calibration, and meticulous fine-tuning of the SCADA application have been executed.

Our colleagues who managed the project were Adrian Pecheanu, Ionut Tomescu and Victor Maruneac.

Leave a Reply